Built for Aussie kitchen renovators

Kitchen renovators, scope the whole job without missing a trade.

Turn demolition, cabinetry, benchtops, splashbacks, plumbing and electrical coordination, appliances and flooring into one clear Scope of Works.

10 scopes on us. No credit card. Then $99 per user a month.

A BuildScope kitchen renovator Scope of Works on an iPhone
Scope ready to review8 line items, Kitchen renovation now
Voice note processed2 min site walk captured now
Missing detail flaggedSite access to confirm 1m
Client email draftedReady to send 2m

Sound familiar, kitchen renovator?

Your kitchen renovators quoting is costing more than time.

Plumbing and electrical coordination missed.

Easy to miss. Expensive to fix.

Appliance specs left out.

Easy to miss. Expensive to fix.

Splashback and benchtop gaps.

Easy to miss. Expensive to fix.

Flooring transitions forgotten.

Easy to miss. Expensive to fix.

Nothing slips through

What BuildScope checks on every kitchen renovator job.

Industry-specific inclusions, prompted before you send the scope, not discovered after you win it.

Strip
  • Demolition
  • Disconnect services
  • Waste removal
Fit out
  • Cabinetry
  • Stone benchtops
  • Tiled splashback
Services
  • Plumbing rough-in & fit-off
  • Electrical & lighting
  • Appliance install

The scope itself

What goes into a kitchen renovator scope of works.

Kitchens fail on coordination: the cabinetry is straightforward and the services around it are where jobs run over.

Line items that belong on it

  • Demolition of existing kitchen and disconnection of services
  • Waste removal and progressive site clean
  • Plumbing rough-in and fit-off to new layout
  • Electrical works, lighting and appliance circuits
  • Supply and install cabinetry, benchtops and tiled splashback

What gets left off

  • Plumbing and electrical relocation. Moving a sink or a cooktop is trade work nobody quoted.
  • Flooring transitions and make good. The old kitchen footprint rarely matches the new one.
  • Appliance install and connection. Supply and install are different scopes and different trades.

Worth excluding in writing

  • Supply of client-selected appliances
  • Rectification of existing services outside the works area
  • Painting beyond nominated make good

Where BuildScope fits

You run the job. BuildScope does the paperwork in the middle.

Kitchen Renovators know how to walk a job and price it. BuildScope takes the paperwork between the site meeting and the quote going out.

BuildScope does this You do this
  1. 01 Enquiry lands Client rings or emails. You book a time to look at the job.
  2. 02 Site meeting You walk the job, measure up and take your photos.
  3. 03 Brain dump Talk or type the job into BuildScope, on site or in the ute.
  4. 04 The questions BuildScope asks what a tired estimator forgets: access, protection, rubbish, patching.
  5. 05 Scope of Works A full scope, trade by trade, preliminaries first, PC and PS kept separate.
  6. 06 Price and export Check quantities and pricing, apply your margin and GST, export the client-ready PDF.
  7. 07 Send and sign You send the PDF. The acceptance page is already in there for the client to sign.
  8. 08 Job runs Book the trades and get moving. The scope is your checklist and your variation defence.

BuildScope covers steps 03 to 06. You do the trade work, it does the paperwork.

Kitchen Renovators already running accounting software? No worries.

Build the scope in BuildScope the way you always do, then move the job into your accounting or job management software as a draft, with the PDF attached. Nothing reaches your client until you send it.

How it works

Three steps from site visit to client-ready scope.

01

Describe the job

Walk the existing kitchen and the new layout together, noting every service that has to move.

02

Answer the questions that matter

BuildScope asks the kitchen questions: layout changes, service relocations, benchtop material and metres, splashback area, and appliance list.

03

Review and send

Check the trade coordination lines, keep appliances and tapware as PC items, and export.

Pricing

Get those hours back for $99 a month.

Per user, everything included. Try it free for 7 days, your first 10 scopes are on us. No credit card.

Everything included

BuildScope

Everything included, priced per user.

$99per user / month

Or pay $990 a year and get 2 months free.

Start free

7 daysFree trial
10 scopesOn us
No cardRequired
Start free, build your first scope

No credit card required.

Prices in AUD, excluding GST. Unlimited scopes after trial. No feature gates. Cancel anytime.

Everything included

  • Unlimited scopes after your trial
  • Voice notes and photo capture
  • Professional scopes and quotes
  • Branded PDF exports
  • Shared job history across your team
  • iPhone, iPad, Android and desktop
  • No feature gates
  • One-click handoff to the software you already use

FAQ

Questions kitchen renovators ask before signing up.

Is BuildScope built for kitchen renovators?
Yes. BuildScope is built around real kitchen renovator scopes of works, with kitchen renovators-specific line items, inclusions and wording. It is not a generic template you have to bend to fit.
Can BuildScope help kitchen renovators avoid missed items?
That is the point. It prompts for the things kitchen renovators commonly leave off a quote, like demolition and disconnect services, so fewer items slip through before you send the scope.
What should a kitchen renovation scope of works include?
Strip out, services and fit out as separate sections. Demolition and disconnection, then plumbing rough-in and electrical works to the new layout, then cabinetry, benchtops, splashback and appliance install. The lines that prevent disputes are the service relocations and the flooring make good, because both are invisible on a plan and obvious once the old kitchen is out.
Why do kitchen renovations run over budget?
Because the quote covers the cabinetry and the visible finishes, and the coordination around them gets assumed. Moving a sink, adding an appliance circuit and making good the floor where the old cupboards stood are three separate trades, and if they are not on the scope as line items they turn into variations after the client has already committed to the price.
Can I edit the scope after the AI builds it?
Always. Every line item, quantity, rate and section is editable. Reorder, add, remove or reword anything before you export.
Does BuildScope work from voice notes and photos?
Yes. Talk through the kitchen renovator job, or drop in site notes and a PDF, and BuildScope turns it into a structured Scope of Works you review and tidy.
How does the free trial work?
7 days free with 10 scopes on us, no credit card. Build and export them however you like. After that it is $99 per user a month, everything included.
Does BuildScope work with the software I already use?
Yes. Connect it once from your account settings and any saved scope can be pushed across as a draft, carrying your line items, section headings and exclusions, with the BuildScope PDF attached. BuildScope never sends it to your client and never raises an invoice: that stays your call.

Also built for the trades you work with.

Turn today's kitchen renovator site visit into today's quote.

Stop letting good leads sit in your camera roll.

Start Free for 7 Days

7 days free, 10 scopes on us. Then $99 per user a month.